news_banner

Steel structural gym

2021.10.09

A new finished steel structural gymnasium, with 40m-long, 26m-wide, 12m-high for 4 floors.


The first floor is used for the indoor swimming poor, while the second floor is used for the basketball gymnasium. The steel frames are made by the steel columns and steel beams. In order to make the thermal insulation better, the brick wall are chosen. For the roof, the steel structural frames with environment friendly painting. The outside wall is covered by the decrative steel plate and some glass curtain wall, which made the whole building more beautiful and attractive. On the roof, the chosen of solar panel will save the energy used inside of the steel building.


   


   


   


admin@marchbuilding.com/veronica@marchbuilding.com

+86 15964254900

+86 15964254900